Jump to main content
Engineer in high-visibility jacket and helmet holding tablet with wind turbines in the background.

markets and solutions

We provide next-level solutions tailored for demanding conditions across a variety of markets.

Some of our projects

Module handling tower

Module handling tower

420 tons module handling tower for subsea operations.
Wide angle A-frame

Wide angle A-frame

Wide-angle, long-reach A-frame for cable-laying vessel
Launch and recovery system

Launch and recovery system

1000 tons launch and recovery system and riser handling system.
Pallets and PPU's

Pallets and PPU's

Pallets and PPUs for an upgrade of IMR Module Handling Tower.
Slurry hose and energy belt reels

Slurry hose and energy belt reels

To supply foundation drilling machine for the installation of wind turbines.
Complete fall-pipe system

Complete fall-pipe system

Complete vertical and inclined fall-pipe system.
Wave absortion system

Wave absortion system

Wave absorption system for test basins
Tectrans Flexbridge 35m

Tectrans Flexbridge 35m

Patented gangway system designed for extended reach and user-friendly operation.
Bumper frame system

Bumper frame system

Bumper tower, sheave towers and 440 tons lifting yoke.
Movable floor systems

Movable floor systems

3000+2000 square meters movable floor system for test basins.
Riser pull-in system

Riser pull-in system

435 tones skidding winch with curved rails on FPSO.
Riser pull-in system

Riser pull-in system

2 x 550 tons riser / umbilical pull-in and mooring system for FPSO .
Umbilical handling system

Umbilical handling system

200 tons umbilical winch and sheave trolley for FPSO
Riser pull-in system

Riser pull-in system

350 tons riser pull-in winch, 40 tons auxiliary winch
Flood gate winches for hydro plant

Flood gate winches for hydro plant

Flood gate winches for hydropower plant.
Umbilical winch

Umbilical winch

Handling umbilical for autonomous underwater vehicle.
AHC winch

AHC winch

100 tons active heave compensated winch for ultra-deepwater semi-submersible rig.
TMS winch system

TMS winch system

TMS winch system. 3-off AHC winches and A-frame docking head.
Major component replacement

Major component replacement

System designed for safe handling and replacement of heavy wind turbine components.
Riser pull-in system

Riser pull-in system

550 tons riser pull-in system for FPSO.
Spud carrier system

Spud carrier system

200 tons spud carrier system for dredging vessel.
Riser pull-in system

Riser pull-in system

50 tons riser pull-inn winch and 300 tons anchor leg installation winch.
Capstan winch for hire

Capstan winch for hire

425 tons capstan winch including spooler machine and HPU for hire.
Riser pull-in systems

Riser pull-in systems

2x250 tons riser pull-in systems for FPSO.
Riser pull-in system

Riser pull-in system

365 tones riser pull-in winch system
Buoy pull-in system

Buoy pull-in system

Buoy heave compensation system and buoy pull in system.
Riser pull-in system

Riser pull-in system

550 tons riser pull-in / pull-out winches, sheave trolley and HPUs for FPSO
Deck hatches and skidding system

Deck hatches and skidding system

For IMR module handling tower. 70t AHC.
Anti-heeling and pitch controll system

Anti-heeling and pitch controll system

Anti-heeling system for crane operations

Anti-heeling system for crane operations

Buoy & riser pull-in winch

Buoy & riser pull-in winch

200 tons buoy and riser pull-in winch for FPSO.
Module handling system

Module handling system

70 tons electrical AHC module handling system with winch and control system.
A-frame and lay wheel system

A-frame and lay wheel system

220 tons A-Frame and lay wheel system with HPU for cable lay vessel.
Buoy & riser pull-in winch

Buoy & riser pull-in winch

150 / 20 tons double drum pull-in winch.
A-frame / LARS

A-frame / LARS

Special 50 tons wide angle A-Frame / LARS.
LARS system

LARS system

Launch and recovery systems with winches and A-frames. 310t + 250t + 200t at 2800m.
A-frame / LARS

A-frame / LARS

Fast winch with A-frame for pipelay. 15 tons at 3000 meters.
Heave compensator (PAHC)

Heave compensator (PAHC)

170 tons inline passive active heave compensator (PAHC)
A-frame / LARS

A-frame / LARS

250 tons A-frame and LARS with AHC compensator, HPU and control system.
A-frame / LARS

A-frame / LARS

250 tons A-frame and Launch and recovery system.
Buoy & riser pull-in winch

Buoy & riser pull-in winch

400 tons buoy and riser pull-in winch for FPSO.
Buoy & riser pull-in winch

Buoy & riser pull-in winch

600 tons buoy and riser pull-in winch for FPSO
Buoy & riser pull-in winch

Buoy & riser pull-in winch

850 tons buoy & riser pull-in winch
A-frame / LARS

A-frame / LARS

315 tons special A-frame / Launch and recovery system.
Riser and mooring pull-in winch

Riser and mooring pull-in winch

165 tons ETMS Riser and Mooring Pull-In Winch, with HPU / Controls for FSO.
Buoy riser pull-in winch

Buoy riser pull-in winch

500 tons buoy riser pull-in winch for FPSO.
A-frame and skidding pallets

A-frame and skidding pallets

Two 250t plough trolley skids, and a special plough 315t A-Frame / LARS system.
Module handling system

Module handling system

Tower with main winch, guide wire, cursor guide and pallet skidding system.
Anti-heeling and roll dampening system

Anti-heeling and roll dampening system

Module handling system

Module handling system

Hangar integrated with guide wire, cursor guide and pallet skidding systems.
 A-frame

A-frame

200 tons A-Frame with integrated AHC system and HPU
Buoy & riser pull-in winch

Buoy & riser pull-in winch

500 tons buoy & riser pull-in winch with HPU for FPSO.
A-frame

A-frame

300 tons overboarding A-Frames with 300 tons winch and HPU
 Buoy & riser pull-in winch

Buoy & riser pull-in winch

150 tons mooring riser pull-in winch for FPSO
Anti-heeling system for crane operations

Anti-heeling system for crane operations

Some of our projects

No items found.